Available 24x7

3 Phase Switchboard and Power Upgrades in Sydney

Move your home to three phase power for a 22 kW EV charger, ducted air conditioning or a bigger home. We arrange the network application and any Level 2 work, so you deal with one company.

  • Network Paperwork Handled
  • Fixed Price Before We Start
  • Licensed and Insured
  • Rated 5.0 on Google

3 phase upgrades typically $7,000 to $11,000+ + GST

Call 0481 228 836

Phones answered 24/7

Request a Free Quote

Online enquiries answered within 24 hours

Is it right for you?

Do You Need 3 Phase Power?

Most Sydney homes run on single phase power, which is plenty for everyday living. Three phase spreads the load across three supplies instead of one, giving your home much more capacity for big appliances running at the same time. If you're weighing up a 3 phase power upgrade, Impulse Electrical Enterprise can look at what you want to run and tell you whether a 3 phase switchboard upgrade in Sydney makes sense. It's usually worth considering for:

  • A 22 kW EV charger
  • Large ducted air conditioning
  • A pool or spa with heating
  • Workshop machinery
  • A large home, or a big renovation that adds a lot of new appliances

When a Single Phase Upgrade Is Enough

Not every home needs three phase. If you just need more circuits and safety switches, or room for solar or a 7 kW EV charger, a single phase switchboard upgrade may be all you need. We'll tell you honestly which one suits your home when we quote.

How it works

What's Involved in a 3 Phase Upgrade

  1. Step 1:

    Assessment and Quote

    We check your current supply, your switchboard and what you want to run, then give you a fixed price before anything is booked.

  2. Step 2:

    Network Application

    We arrange the network application for the change to three phase, whether your home is supplied by Ausgrid or Endeavour Energy, and any Level 2 work needed on the network side. You only deal with us, so there's no one else to chase.

  3. Step 3:

    New Switchboard

    We install a new three phase switchboard with safety switches and clearly labelled circuits, and upgrade the cabling from the meter to the board where needed. This 3 phase power installation work usually takes about two days.

  4. Step 4:

    Testing and Certificate

    We test everything before the power goes back on and give you a Certificate of Compliance for Electrical Work (CCEW) for your records.

Prices

How Much Does a 3 Phase Upgrade Cost in Sydney?

Most 3 phase upgrades cost $7,000 to $11,000+ + GST. We confirm your price in a free, fixed quote before any work starts.

What Affects the Price

The biggest factors are how far your meter and switchboard are from the street connection, whether the board needs to move and the size of the new board. The work needed on the network side also varies from street to street, which is why we confirm everything in your quote.

  • Prices assume reasonable access to your switchboard and meter.
  • Depending on the job, the price may include the Level 2 work on the network side. Your quote shows exactly what's included.
  • Network and metering provider charges may also apply, and your quote states which of these it includes.
  • Your final price is confirmed in a free, fixed quote before we start.
Get a Fixed Price Quote

Free quote, fixed price before we start

Recent jobs

Recent 3 Phase and Supply Upgrades

Two recent jobs where we upgraded a home's supply and switchboard.

  • Three Phase Load Centre in Prestons

    We installed a new three phase load centre with clearly labelled circuits, safety switches and surge protection.

    March 2026

  • Ready for Solar and an EV Charger

    For a home moving off gas, we built a custom switchboard, upgraded the incoming supply and arranged new metering, leaving it ready for solar and an EV charger.

    May 2026

Why Impulse

Why Sydney Homeowners Choose Us for 3 Phase Upgrades

  • Licensed and Insured

    NSW Contractor Licence 389893C and $20 million public liability cover. Our director, Matthew Neil, supervises every job.

  • One Company From Start to Finish

    You deal only with us. We arrange the network application and any Level 2 work as part of your upgrade.

  • Warranty-Backed Work

    Our workmanship is covered by our warranty, and products and parts come with a 2 to 7 year manufacturer's warranty, depending on the product. Your rights under the Australian Consumer Law always apply.

  • Rated 5.0 on Google

    Sydney homeowners rate us 5.0 on Google. Read our Google reviews.

Thinking About 3 Phase Power? Get a Fixed Price

Tell us what you'd like to run, such as a 22 kW EV charger or ducted air, and we'll tell you whether three phase is right for your home and give you a fixed price.

Call 0481 228 836

Phones answered 24/7

Request a Free Quote

Online enquiries answered within 24 hours

3 Phase Upgrade Questions

It depends on the charger. Single phase home chargers usually top out at around 7 kW, which suits most drivers charging overnight. A 22 kW charger, such as the zappi 22 kW, needs three phase power. We can help you choose the right EV charger for your home.

Most can, but it depends on the supply available in your street. That's checked as part of the network application we arrange for you, and we'll let you know early if there's a problem.

The work itself usually takes about two days, depending on your site. The overall timing also depends on the network's approval, so we give you a timeframe with your quote and keep you updated.

Yes. We take care of the network application, whether your home is supplied by Ausgrid or Endeavour Energy, and organise any Level 2 work, so there's no one else for you to coordinate.

We're based in Strathfield and do 3 phase upgrades across the Inner West and greater Sydney. Check the suburbs we cover.